Skip to main content

Green Loop Draft Implementation Plan

On February 25, 2026, the Park Board received a presentation on the Green Loop from Parks Planning & Development Manager Mariah Gill. At this time, the current project timeline is to review branding and wayfinding options with Park Board in April, provide a draft implementation plan to the Board and City Council in May, with a goal to publish the plan in Summer 2026. After this point, the long-term goal would be to review and update the Green Loop Plan every 5 years.

The Board and Staff discussed the issues below.

COMMUNITY ENGAGEMENT
In August and September 2025, Alta Planning + Design (Alta), in partnership with City staff, conducted a robust engagement process that included in-person events, neighborhood meetings, updates to Park Board, an online survey with interactive mapping, lawn signs, a project website, and direct outreach. Participation was strong, with 874 survey responses, over 1,500 location- specific map comments, and broad geographic representation across Finn Hill, Juanita, and other Kirkland neighborhoods.

Community feedback emphasized walking and enjoying nature as top priorities, along with wildlife protection, environmental preservation, neighborhood connectivity, and safe access to parks such as O.O. Denny Park and Juanita Beach Park. Residents also identified key barriers, including Juanita Drive and 100th Avenue arterial roads, and expressed interest in amenities such as ADA access, wayfinding, lighting, and potential bicycle accommodations. Concerns raised included ecological impacts, cost, privacy, safety, and impacts to adjacent private property.

The Juanita Neighborhood Association provided targeted alignment suggestions and emphasized access points, use of City-owned parcels, exploration of extensions north of Juanita Heights Park, and the importance of ongoing communication.

ENVIRONMENTAL AND CORRIDOR ANALYSIS
Alta, supported by ESA and Cascadia, combined community input with desktop and field-based environmental analysis to evaluate potential corridor alternatives. Staff also conducted field visits across publicly owned parcels to understand site conditions, critical areas, slopes, connectivity opportunities, and constraints. In some areas, connectivity will rely on existing sidewalks, and in other areas will rely on certain unopened rights-of-way with private encroachments that will require further review.

Each corridor alternative was evaluated using the following criteria:

  1. User Experience – Preferred segments are located within or adjacent to parks and green spaces and provide separation from roadways where feasible.
  2. Slope and Environmental Impacts – Preferred segments align with natural land contours to minimize excavation, structural elements, tree removal, and impacts to critical areas such as streams and wetlands.
  3. Connectivity – Preferred segments connect to existing trails, sidewalks, parks, schools, and surrounding neighborhoods to create a cohesive and accessible network.
  4. Public Input – Preferred segments align with the community’s vision, values, and priorities identified through outreach and engagement.
  5. Property Ownership and Conditions – Preferred segments utilize publicly controlled property that is already secured or readily available for trail development.

CONSULTANT TRANSITION
In January 2026, the City and Alta Planning + Design ended their partnership. As a result, City staff will complete the Green Loop Implementation Plan in-house, building upon the technical analysis and community engagement already completed. Staff will carry forward the established evaluation criteria and community priorities as the Plan is finalized and prepared for publication.

NEXT STEPS:
Staff will move forward with a focused, implementation-driven approach to complete and publish the Green Loop Implementation Plan and begin advancing priority segments.

Staff will:

  • Use existing data, maps, and prior community engagement to finalize the Implementation Plan without restarting earlier planning work.
  • Shift remaining resources away from broad concept planning and toward targeted acquisition, branding and wayfinding development, foundational construction, and ongoing engagement.
  • Recognize that prior large public outreach has already established broad community values; future engagement will be more location-specific and implementation-focused.

Staff will document and communicate progress by:

  • Publishing an annual or semi-annual summary of engagement completed.
  • Providing ongoing updates through:
  • Annual or semi-annual Green Loop status letters to the community
  • Periodic press releases and website updates
  • Targeted small-group meetings with adjacent property owners, user groups, and segment-specific neighborhood or interest groups.
  • Updates to the Green Loop

Implementation Plan every 5 years Staff will also:

  • Use remaining King County Levy funding to retain a graphic design and marketing consultant to develop Green Loop trail branding, wayfinding concepts, and a cohesive visual identity.
  • Direct available funds toward priority property acquisition and foundational construction of key trail segments.
  • Advance property access and acquisition through targeted outreach, prioritizing willing sellers, strategic easements, and parcels that unlock future connections.
  • Continue evaluating a range of voluntary land access and ownership tools—including temporary use agreements, licenses, easements, and fee acquisition—with fair compensation and potential owner benefits clearly communicated.
  • Coordinate internal stakeholder review with Planning and Public Works to align Green Loop implementation with related City projects and policies.

Staff will complete and publish the Green Loop Implementation Plan by June. The plan will include corridor map and phasing, preliminary cost estimates, a defined ongoing engagement framework, and language establishing the plan as a living document to be formally updated every 5 years.

PARK BOARD RESPONSIBILITIES
Park Board members will be asked to weigh in on future wayfinding and trail branding concepts, and Staff will also rely on the Board’s assistance in connecting with key user and community interest groups as segment-level implementation moves forward.

HISTORY
The Green Loop Corridor reflects a long-standing community vision led by the Finn Hill Neighborhood Alliance (whch includes our Goat Hill community) and Juanita Neighborhood Association community members.

Grassroots advocacy has resulted in key parcel acquisitions, conceptual mapping, and sustained momentum, ultimately leading to inclusion of the Green Loop in the City’s 2044 Comprehensive Plan and funding support through the King County Parks Levy.

Adopted on December 2, 2024, the 2044 Comprehensive Plan includes Goal FH-5 of the Finn Hill Neighborhood Plan, calling for the establishment of a Green Loop Corridor connecting parks, open spaces, pedestrian trails, wildlife corridors, and natural areas to promote active recreation and environmental preservation. Policies FH-5.1 and FH-5.2 direct the City to develop a master plan (now referred to as the Green Loop Implementation Plan) under Park Board guidance and to secure public easements or acquisitions through the process to advance the corridor.

The Green Loop is supported by strong community interest due to its broad public and environmental benefits, including expanding access to nature and recreation, improving pedestrian connections, preserving wildlife corridors, protecting steep slopes, and supporting a healthy tree canopy.

In 2020, Council adopted Resolution R-5446 authorizing the use of King County Parks Levy funds to develop a master plan, acquire key parcels and easements, and construct trail segments consistent with the Finn Hill Neighborhood Plan policies. In 2025, the City initiated development of the Green Loop Implementation Plan to fulfill that direction. The plan is intended to provide corridor alignment, cost estimates, phasing, design standards, and general guidance to support implementation.

It is recognized that implementation of the Green Loop will occur incrementally over several decades, with progress shaped by funding availability and the willingness of private property owners to participate.

Learn more:

Comments

Popular posts from this blog

Group Mailbox Relocation

UPDATED APRIL 21, 2026: The team attempting to move a portion of the mailboxes to the top-of-the-hill has disbanded. During this 5 month effort, we have been unable to find a location suitable to the residents, or that meet the safety standards of the Post Office and the City. Narrow road widths less than 20ft and limited sight distances are the primary obstacles. This does not make the problem go away. Our Postmaster, Michael Crimmins, acknowledges there's a safety issue for his drivers and would like to see a resolution. Vehicles navigating the hairpin turn apparently add difficulty when making mail deliveries. From a residents perspective, the plastic mailboxes are deprecated and a security risk. They should be replaced with newer, more secure, metal cluster boxes. The convenience of mailboxes located closer to our homes remains a desirable goal, especially to those at the top of the hill. Other considerations: residents have been asking the Kirkland Post Office to c...

Passing the Torch, Sharing the Light

All things must pass... and the good times must be celebrated! Goat Hill residents come and go but never has there been a shift quite like the present. Scott and Lisa, Dave and Mary, Andrea, Scuba and Adrian, and Nick and Candace all have either moved or are planning to move this spring. Soon the Doblers and Uta and Tovi will move on to their next adventures. Some will stay local. Some will move halfway around the world. All will be missed. One can't help but reflect on the many traditions we've enjoyed up here on The Hill. Easter egg hunts, Christmas parties, and the monthly First Friday gatherings make this place an incredibly special and unique place to live. One of the most enduring traditions has been the solstice firings, both winter and summer. Our artists in residence, Lisa Crubaugh and Scott Miller have carried this tradition from it's roots in Ballard where it was started by Regnor Reinholdtsen, to its current location at the top of Goat Hill. ...

Billy Goat Trail

UPDATE July 27, 2026: Progress has been challenging. The City has concerns with the steep slopes and has prioritized land acquisition over trail creation or improvement. It could take years if we wait for the City to move this important project forward. To hopefully expedite progress, the UW Green Futures Lab has been engaged to create a preliminary plan for the Billy Goat Trail that we can then present to the City. This should save time and money. A professional civil engineering firm would then be engaged to prepare plans for a trail and submitted for permits. Costs for this approach are not free. The Finn Hill Neighborhood Association has stepped up but yes, this will cost money. In 3-5 weeks, the UW Green Futures Lab should be able to find an acceptable path from Juanita Heights Park down to NE 120th St. It may be our social, neighbor-built trail, or they may find a better, more accessible path. There are two wetlands areas to negotiate and literally hundreds of steps to build....