King County Access to Community Beach for Urgent Manhole Repair in Juanita Creek

Updated 8/14/2025: Danny Arauz, Community Services Wastewater Treatment Division, sent this message: "Just wanted to share an update (with good news!) about the Juanita sewer repair project. Due to the lake levels being abnormally low, the contractor decided they could complete the repair work without having to de-water the area around the maintenance hole. This removed the need for large equipment and access road. Therefore, the work was able to be wrapped up in just a few days this week. We don’t expect any further impacts to Tract C with this project and folks can go back to using the property as normal after this week. You might still see some King County staff on-site in the next few days. Feel free to distribute this update with your networks as you see fit. Please let me know if you have any questions, and thank you for your patience and understanding during this process."

Summary: Juanita Creek was rushing in from a breach in the concrete at the top of the manhole and falling 22' and mixing with the wastewater. This was causing unnecessary processing of the effluents entering the waste water treatment plant. The fix actually took three days instead of a 3-4 week effort in the original plan.

Updated 8/5/2025: King County Wastewater Treatment Division plans to perform an emergency repair on their maintenance hole located adjacent to Juanita Beach Camps Tract C. We fully support the urgent need for sewer reconstruction, however this effort will restrict our community's ability to access our beach when we use it most. A restricted 6' pathway will be our only access path to the beach. Boats and paddleboards will be inaccessible if left where they are. Best to move them now to the West side of the property. Trailor should not be stored on the East side of the parking area and must find another home.

The image above shows the areas that will be impacted during the repair work.  This work should take approximately 3-4 weeks to complete.  We do not know the exact start time of the work as they are working with several agencies (Washington Department of Fish and Wildlife, City of Kirkland, Army Core of Engineers) to secure the necessary permits. We will know more precisely once the permits are issued.

King County Wastewater Treatment focals have been provided names for all (100+) Juanita Beach Camps property owners. They will use this list to mail out information as it becomes available. Additionally, we are being asked to sign a letter stating we are aware of this project. However, the letter needs more information and we've asked them for a few clarifying edits.

King County employee Danny Arauz (daarauz@kingcounty.gov) addresses most of our concerns below.

  1. Parking: There will not be enough room to park county vehicles, heavy equipment, and residents vehicles. Property rights must be respected. Parking needs to be designated to allow access for community beach owners and condo owners. Currently the (28+/-) condo owners park on the West side, the (100+) property owners park on the East side of Tract C. The diagram indicated the total elimination of our property owners coveted East side parking. Will workers be required to park their vehicles at Juanita Beach? Or the gravel parking across from Spuds?
    King County says: Contractors and staff will use the minimum space possible on Tract C for parking and staging. Equipment will be staged along the King County easement area. We are currently exploring options that don’t require staging equipment in the parking lot, however this is not finalized. We will be using the parking lot for ingress and egress of construction vehicles into the work zone which could impact parking.
  2. Access: The diagram appears to totally eliminate property owners access to the beach. Please clarify if this is indeed a total or partial shut down of community access. Will there be a footpath? A construction fence?
    King County says: Resident access to the beach in Tract C will be maintained via a designated 6-foot-wide path outside the construction area. There will be a temporary access road built from the parking lot to the maintenance hole, and a construction fence around the work areas. Access to the work areas will be limited during August and September.
  3. Boat storage: A number of boats are currently stored in the area designated as limited access. Do you have a plan to address where these will be relocated? Will they continue to have access to launch from the beach? Will they need to be removed permanently?
    King County says: Boats stored on the east side of Tract C might have to be moved to the west side, or moved off site, to accommodate access for construction vehicles. I would appreciate your help in getting in touch with the boat owners to communicate this.
  4. Property damage: Invariably the heavy equipment and increased activity will damage our property. Regravelling the parking lot, filling pothiles, replacing topsoil and reseeding the grass will be expected. Beavers have tunnelled under our property making soil unstable. Equipment will no doubt leak fuel and oil. Runoff must be mitigated.
    King County says: Oil and chemical leaks are risks we mitigate on all our construction projects and take every precaution for. King County Contractors will be held up to the standard of our permitting agencies for environmental hazards. No trees are expected to be removed on Tract C, except for stump removal. Some trees in the easement area around the maintenance hole will have to be removed. As part of our restoration plan, we will replant more new trees than were removed in the easement area.
  5. Vegetation restoration: Trees and schrubs will need to be replaced. Please provide a restoration plan.
    King County says: Grass and soil in Tract C will be disturbed along the vehicle access route. Any disturbed vegetated areas will be restored to equal or better condition following construction. Our restoration efforts always seek to leave our work sites better than we found them.
  6. Fence rebuild: Please provide a plan to replace the fencing.
    KC answer. We will replace any removed fence portions with a similar fence that is as close to existing conditions as possible, as is standard across all our projects.
  7. Wildlife habitat: There's a beaver lodge that will be adversely affected, and a limited salmon run during the construction period. How will impact to wildlife be mitigated?
    King County says: Our team conducted a wildlife survey and found that the beaver dam is inactive. Part of our project’s schedule is driven by regulatory requirements around salmon migration. We have a defined timeframe (called a “fish window”) that we are allowed to work in. We will meet all regulatory requirements around wildlife preservation as defined by the State Department of Ecology and the Army Corps of Engineers.
  8. Liability: How does the county handle liability in a case like this? Young children use this property daily. Birthday parties are being planned. Safety of our community is of paramount concern.
    King County says: Our contractor will be held to strict safety standards, however this will be an active construction site, so some precaution from residents will be needed. Following all posted construction signage guidance and not entering the work zones or climbing on construction equipment will be important. Safety is a collaborative effort and we will need cooperation from residents to maintain a safe working environment. For coordinating events and birthday parties, please don’t hesitate to have folks reach out to me (Arauz, Daniel daarauz@kingcounty.gov) and we can discuss coordination with the contractor so both sides know what to expect and can plan accordingly.
  9. Noise: Pumps are expected to run 24 x 7.
  10. Work hours: Work is expected to run through daylight hours and over some weekends. Is this possible to move this repair to occur after Labor Day?

More Information:

Comments

Popular posts from this blog

Group Mailbox Relocation

UPDATED APRIL 21, 2026: The team attempting to move a portion of the mailboxes to the top-of-the-hill has disbanded. During this 5 month effort, we have been unable to find a location suitable to the residents, or that meet the safety standards of the Post Office and the City. Narrow road widths less than 20ft and limited sight distances are the primary obstacles. This does not make the problem go away. Our Postmaster, Michael Crimmins, acknowledges there's a safety issue for his drivers and would like to see a resolution. Vehicles navigating the hairpin turn apparently add difficulty when making mail deliveries. From a residents perspective, the plastic mailboxes are deprecated and a security risk. They should be replaced with newer, more secure, metal cluster boxes. The convenience of mailboxes located closer to our homes remains a desirable goal, especially to those at the top of the hill. Other considerations: residents have been asking the Kirkland Post Office to c...

Passing the Torch, Sharing the Light

All things must pass... and the good times must be celebrated! Goat Hill residents come and go but never has there been a shift quite like the present. Scott and Lisa, Dave and Mary, Andrea, Scuba and Adrian, and Nick and Candace all have either moved or are planning to move this spring. Soon the Doblers and Uta and Tovi will move on to their next adventures. Some will stay local. Some will move halfway around the world. All will be missed. One can't help but reflect on the many traditions we've enjoyed up here on The Hill. Easter egg hunts, Christmas parties, and the monthly First Friday gatherings make this place an incredibly special and unique place to live. One of the most enduring traditions has been the solstice firings, both winter and summer. Our artists in residence, Lisa Crubaugh and Scott Miller have carried this tradition from it's roots in Ballard where it was started by Regnor Reinholdtsen, to its current location at the top of Goat Hill. ...

Billy Goat Trail

UPDATE July 27, 2026: Progress has been challenging. The City has concerns with the steep slopes and has prioritized land acquisition over trail creation or improvement. It could take years if we wait for the City to move this important project forward. To hopefully expedite progress, the UW Green Futures Lab has been engaged to create a preliminary plan for the Billy Goat Trail that we can then present to the City. This should save time and money. A professional civil engineering firm would then be engaged to prepare plans for a trail and submitted for permits. Costs for this approach are not free. The Finn Hill Neighborhood Association has stepped up but yes, this will cost money. In 3-5 weeks, the UW Green Futures Lab should be able to find an acceptable path from Juanita Heights Park down to NE 120th St. It may be our social, neighbor-built trail, or they may find a better, more accessible path. There are two wetlands areas to negotiate and literally hundreds of steps to build....